PRINCE2 training– Starting up a Project


The objective of starting up a Project process is to ensure that:
• There is a business justification for initiating the project (documented in an outline Business Case)
• All the necessary authorities exist for initiating the project
• Sufficient information is available to define and confirm the scope of the project (in the form of a Project Brief)
• The various ways the project can be delivered are evaluated and a project approach selected
• Individuals are appointed who will undertake the work required in project initiation and/or will take significant project management roles in the project
• The work required for project initiation is planned
• Time is not wasting initiating a project based on unsound assumptions regarding the project’s scope, timescales, acceptance criteria and constraints.

The Context of starting up a project


Projects can be identified in a variety of ways and thus have a wide variation in the information available at the time of start-up. PRINCE2 training calls the trigger for the project the project mandate, which is provided by the responsible authority which is commissioning the project – typically the corporate or programme management organisation. The term project mandate applies to whatever information is used to trigger the project, be it a feasibility study or the receipt of a ‘request for proposal’ in a supplier environment. The project mandate should provide the terms of reference for the project and should contain sufficient information to identify at least the prospective Executive of the Project Board. The mandate is refined to develop the project brief.

The Project Board must be provided with sufficient information to make the decision to initiate the project. The Project Brief is prepared for this purpose.

The effort involved in starting up a Project will vary enormously from project to project. If the project is part of a programme, the programme itself should provide the Project Brief and will appoint some, if not all, members of the Project Board, thus eliminating much of the work required in this process. In such cases, the Project Manager should validate what is provided by the programme and, if necessary, recommend modifications.

The preparation of the outline Business Case and the assembling of the Project Brief (which are parallel and interactive activities) require regular and frequent interaction and consultations between the Project Manager, the Project Board members and other stakeholders. The more time spent on getting the requirements clearly captured during the Starting up a Project process, the more time will be saved during project delivery by avoiding issues, exceptions and replanning.

The contents of the Project Brief are later extended and refined into the Project Initiation Documentation via the Initiating a PRINCE2 Training Project Process.

Our Training Locations

London

 

London Clerks Court

Nottingham

 

Nottingham

Manchester

 

Manchester Pall Mall

Glasgow

 

Glasgow Buchanan Street

Reading

 

Reading Atlantic House

Bristol

 

Bristol Temple Quay

Birmingham

 

Birmingham Temple Row

Leeds

 

Leeds Wellington Place

Edinburgh

 

Edinburgh Conference House

Belfast

 

Belfast Clarendon Dock

Newcastle

 

Newcastle Rotterdam House

Milton Keynes

 

Milton Keynes Fairbourne Drive

Norwich

 

Norwich Stannard Place

Liverpool

 

Liverpool City Center

Dublin

 

Dublin Alexandra House

Maidstone

 

Maidstone Kings Hill Ave

Cambridge

 

Cambridge Vision Park

Southampton

 

Southampton Airport

Cardiff

 

Cardiff Gate Business Park

London Nottingham
Edinburgh Glasgow
Manchester Birmingham
Leeds Bristol
Reading Belfast
Newcastle Milton Keynes
Norwich Liverpool
Dublin Maidstone
Cambridge Southampton
Cardiff View all locations
Read our Blog Lines are open 7am-10pm Monday-Sunday
Bookmark and Share